Bathroom renovation in London and area
A bathroom is mostly floors, walls and water, and that's where we're strongest. We take the room back to the base, waterproof it properly and finish it with tile and fixtures that last.

Is it right for you?
- Great for: main bathrooms, ensuites, powder rooms, basement bathrooms
- Popular upgrades: walk-in tile showers, large-format floor tile, new vanity, heated floors
- Keep in mind: plumbing and electrical are done by licensed trades
What we do
- Demolition & disposal
- Subfloor repair & levelling
- Waterproofing membrane
- Floor & wall tile
- Tub or walk-in shower
- Vanity, toilet & fixtures
- Trim & finishing
What affects the price
- Size of the space (sq ft)
- The product you choose
- Subfloor prep and levelling
- Stairs, trim and removal
Your free measure gives you an exact written quote.
Bathroom renovation questions
How long does a bathroom renovation take?
Most bathrooms take about 1–3 weeks, depending on the size and what we change. Your quote includes a schedule.
Can you just redo the floor?
Yes. Bathroom floors on their own are welcome, from removal to new tile or waterproof vinyl.
Do you help choose tile and fixtures?
Yes. We'll go through options with you during the free in-home visit.